Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. The behavior of a material where the material deforms under load and does not go back to its original shape is called plasticity. 10) What is the maximum backfill lift thickness? 2016v1.0 Chapter 4 16, 17 PAVEMENT DRAINS Pavement subsurface drainage is essential in obtaining a well performing pavement, whether it is flexible, rigid or composite. Students must bring valid ID & attend class in order to test. Find the right form for you and fill it out: VisitingProfessorofLaw,StanfordLawSchool(W No results. 0 Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. - 2000, If you believe that this page should be taken down, please follow our DMCA take down process, Something went wrong! aggregate from the same source, or break up the material . The video tape/dvd/digital photographs should be of such clarity, detail and resolution as to clearly show the conditions of the interior of the pipe/culvert and detect any defects within the pipe or culvert as specified herein. 6) Where can the typical underdrain drawings be found? Soil compaction | UMN Extension - University of Minnesota %%EOF Grades and certifications are issued within 15-30 business days after the testing date. VDOT uses AASHTO and Unified Soil Classification Systems to classify soils. True or false: A soil that contains a high percentage of fines is more affected by water that one with a low percentage of fines. Provide, SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION, Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING. 16) In the case of UD 7, as asphalt concrete cap is used to complete the backfilling and provide the final surface that is even with the shoulder. A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with, Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. Try Now! endstream endobj 283 0 obj <> endobj 284 0 obj <> endobj 285 0 obj <>stream The Soils and Aggregate Inspector Certification Course is designed for those individuals responsible for the sampling and testing of soils and aggregates used in base, subbase and roadway embankment construction. Where applicable, pulleys may be incorporated into the system to change the direction of pull so that inspection personnel need not physically enter the pipe, culvert or manhole. Unsuitable foundations must be stabilized at the engineer s direction. <>/Metadata 1689 0 R/ViewerPreferences 1690 0 R>> STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES. Cracks shall be digitally scanned to allow for accurate measurement. 3. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix C | 5 Refer to VDOT Road and Bridge Specifications, Section Procedures (d) Post Installation Inspection for detail requirements and remediation procedures. Trench widths may be varied, based on the competency of the in situ soil, backfill materials, compaction levels and loads. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2) Mechanical compacting ram: If a mechanical compacting ram is used, it must be calibrated to produce results When backfill material is above the spring line of the pipe, start at the trench wall and work towards the pipe. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time. bc the dense gradation provides more strength by filling voids. CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements, DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. Drainage Manual. If the mandrel test is to be performed to mechanically measure deformations/deflections of the pipe/culvert, the mandrel used shall be a nine (or greater odd number) arm mandrel, and shall be sized and inspected by the Engineer prior to testing. All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. hbbd``b`~$CC`LZ eQ@dq ;&F d}0 Click here to access guidelines for the VDOT Materials Certification Schools Program (Section 114, Manual of Instructions) (PDF, 72 KB). Copyright 2023, VDOT. hb```f``2g`2X@Y809wCc cRBTK@S0UYB:d P&t%iV'XhS:Ku.0%7Q4~Av{iL^$x0%Prmc*700x\65;kYw;^(ew5efv] qKZS;\c zr Gg^tL)QMpJhzHrEO *~\,g -. \@%+TB)9~D ru^j:c;1JJ u]5ZU._] ueV^+/5 Work includes furnishing and installing precast modular blocks, : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials. Compaction testing on No. 57 stone can be used as a backfill in the sub foundation. The middle of the bedding, should be loosely placed and not exceed 8 inches. A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. The video camera inspection is to be conducted with a VDOT representative present. For larger diameter pipe, >30 inches, embedment materials should be worked under the haunches by hand. The above components are designed to perform three functions to aid in draining water from the pavement; these are: Intercept Collect Discharge Following is a general guide on the installation of underdrain/edge drain systems: 1) Excavate trench making sure the side walls are stable 2) Remove any sloughed materials from the trench 3) The dug out material is picked up with conveyor belt and loaded in trucks or piled on one side then picked up by a front end loader. 309 0 obj <>/Filter/FlateDecode/ID[<8C7926BE3CE0893EFFE3D4D04181CA9C><5F163F4C9BEAEE4B999AF08BC3EDB7FD>]/Index[296 27]/Info 295 0 R/Length 74/Prev 443524/Root 297 0 R/Size 323/Type/XRef/W[1 2 1]>>stream When performing a manual visual inspection: There must be adequate crawl/walking space and VDOT Safety Policy and Procedure #8 Confined Space Entry Policy and Procedure must be followed. Some links may require the Adobe Reader. STORM SEWERS 402.01. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. %PDF-1.4 What is the moisture content at which soil begins to behave like a liquid called? 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe. 11) Pipe openings in precast drainage structures shall not exceed the outside cross sectional dimensions of the pipe by more than how much? The top few inches should be slightly yielding (loose) and fill the corrugations. Personal Holding C, Civil Service Personal Background Evaluation, Revised 7/16. And the pipe must provide structure, because if the ground above the pipe collapses then the pipe can no longer perform as a conduit. 4 0 obj FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness. VDOT Soils and Aggregate Compaction: Chapter 2. PDF Establishing Theoretical and Target Values for Density and Moisture Content If the soils is 100 percent saturated and the voids are full of water and has a high MC. How many blows does each layer require? 4 to 3/4 in. VDOT Soils and Aggregate Compaction Flashcards | Quizlet Trenching should be completed in existing soils with sidewalls reasonably vertical to the top of the pipe. Construction loads often exceed design loads. Silts and clays are made of particles that are smaller than which sieve? The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. In a rigid pipe, this zone has zero effect on the load carrying capacity. 2) 108 in. of the rammer used to compact the soil or soil and aggregate mixture in the mold and the number of layers placed into the compaction mold for compaction. Proper haunching provides support to ensure the pipe s strength is achieved. STORM SEWER CALCULATIONS 7-4 7.6. This site uses cookies to enhance site navigation and personalize your experience. ), Index. Rock more than 2 inches in its greatest dimension shall not be placed within 12 inches of pipe. A compacted soil has a reduced rate of both water infiltration and drainage. Minimum/Maximum Cover All Culverts 24 minimum cover Absolute minimum fill height (12 ) Except for entrances (9 minimum) All pipe should have three feet of cover on it before construction traffic is allowed across it. Importance to Maintenance & Water Quality. 2016v1.0 Chapter 4 6, 7 TRENCH FUNDAMENTALS Trench Terminology The bedding is typically 4 8 thick. 4 in.) For information on the VECAT program, contact Caroline Fahed, 804-288-3169. All rights reserved. The current deadline to have Soils and Aggregate Proficiency exams completed by is . What is the behavior of a material where the material deforms under load and does not return to its original shape called? This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. Links may open in a new window. % AASHTO T99 The Moisture-Density Relations of Soils using a 5.5-pound Rammer and a 12-inch drop. The initial backfill of select Type I backfill protects the pipe during installation from impact damage and extends to the springline of the pipe. Care must be exercised to ensure placement and compaction of the embedment material in the haunches. (Zero Air Voids = ZAV). hbbd``b`$BAD`LZ H0j( a2H-q u\?#v#_ Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL, SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS, San Antonio Water System Standard Specifications for Construction ITEM NO. (Provide three) a) b) c) 2) Explain when a rock correction is utilized and what happens to the laboratory maximum dry density and optimum moisture values after a rock . Your one-stop source for VDOT maps, data and project info. If your certification expires this year, you must successfully complete all requirements for the certification by completing an instructor-led or self-study course and any proficiency in the same calendar year. For questions or concerns regarding MCS grades or certification status, contactus at MaterialsCertification@vdot.virginia.gov. 7 0 obj 2 0 obj Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall, Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Some links may require the Adobe Reader. %PDF-1.5 % The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and, 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. VDOT Soils and Aggregate Compaction: Chapter 5 - Quizlet Post installation inspections shall be conducted no sooner than 30 days after completion of installation and placement of final cover (except for pavement structure). Submit, SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. True or false: Open graded aggregates are used in pavement to give the structure more strength. AASHTO T180 The Moisture Density Relations of Soils using a 10-pound Rammer and an 18-inch drop. 57 stone be used? 5) Why is lime used with soil? Repair of service laterals located, Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete, REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502), Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. 14) What is the maximum deflection allowed for flexible pipe? PDF Appendix B - Virginia Department of Transportation - Home PDF Appendix G - Answers to Study Questions (REVISED) - Virginia